Sample acceptance test report

For US$1,500 before tax, you receive agreed pass criteria, a report with evidence, and one retest when the fix meets the trial conditions. Follow a warehouse team from its first report to its release decision.

Fictional sample. The warehouse, test results and record IDs are illustrative. The trial price and terms are LLL’s published offer.

From the release question to a decision

A warehouse manager is preparing to release a new shipping screen. If someone presses Ship again, will it deduct stock twice? The manager and QC agree up front that retrying the same shipment must leave stock at 7 and create only one record.

  1. Round 1

    Initial check finds one serious problem

    QC runs 3 agreed scenarios in the staging environment with Chrome, using synthetic data. Normal shipping and recovery pass. Retrying the same operation does not: shipping 3 of 10 units twice creates two records and leaves stock at 4 instead of 7. The finding is critical, so QC recommends holding the release.

  2. Fix

    Your developer fixes it

    The fix is made by your own developer, or by us as a separate small fix from US$750 after you approve the estimate. QC does not review its own fix; the retest below is run from a non-implementing role.

  3. Retest

    QC retests the same condition, once

    On the fixed build (example-43) QC repeats the same scenario against the same pass condition. Stock is 7 and there is one record. The retest is included once for the in-scope item.

  4. Decision

    The business owner decides

    QC revises its recommendation for the checked scope. The fictional business owner then decides on release, on their own terms. QC provides facts and a recommendation; the decision stays with the client.

Sample acceptance test report

Fictional data. The real report uses the same sections for your system.

Initial result: example-42

  • 2Pass
  • 1Fail
  • 0On hold
  • 0Not run

QC recommendation after round 1

Hold the release. A critical finding (BUG-001) affects stock accuracy in a core flow.

Test overview

Target
Fictional warehouse system, "ship from stock" flow
Build
example-42 (initial) / example-43 (retest)
Environment
Staging, Chrome (the one agreed browser)
Data
Synthetic data only
Scope
3 scenarios in 1 flow

Scenario results

IDScenarioStatusNote
SC-01Normal shipping from stockPassStock 10 → 7, one shipment record.
SC-02Recovery after a failed shipmentPassA failed shipment leaves stock at 10 with no shipment record.
SC-03Retry the same operationFailSee BUG-001 below.

BUG-001 — Critical: retrying a shipment creates a second record

Steps to reproduce
1) Open an item with stock 10. 2) Ship 3 units. 3) Repeat the same operation (press the ship button again).
Expected
Stock is 7 and there is one shipment record.
Observed
Stock is 4 and there are two shipment records.
Evidence
Shipment log and stock balance. The sample extract is shown below.

Records found after the retry

Fictional shipment records (example-42)
Record IDAmountCreated
SHP-EX-00013 unitsStep 2
SHP-EX-00023 unitsStep 3 (retry)

Two records for one intended shipment. The system recorded 6 units shipped and deducted them from stock, leaving 4.

Retest result: example-43

Same condition
Ship 3 of 10, then repeat the same operation.
Expected
Stock 7, one record.
Observed
Stock 7, one record.
Status
SC-03: Pass. BUG-001 closed.

The retest on example-43 covered SC-03 only. QC withdrew the hold for BUG-001 after verifying the fix. The initial results for SC-01 and SC-02 remain tied to example-42.

Decision in this example. The warehouse manager reviews the retest and approves the shipping update. QC records the decision, the build and the scope.

What the trial includes

The trial is US$1,500, one time, before tax.

Scope
Up to 3 business flows, up to 15 scenarios in total, 1 system, 1 test environment, 1 agreed browser
Timing
Initial report in about 5 business days once the agreed conditions and test environment are ready
Retest
One in-scope retest, if the fixed build is received within 10 business days of the first report
You receive
Agreed pass criteria, the initial report with evidence and reproduction steps, and a retest addendum with the updated recommendation when applicable
Optional
Separate small bug fixes from US$750 per item, after you approve an estimate

Code fixes, load and security testing, and building new test automation are not part of the trial.

Questions

Is this a real client report?

No. It is invented to show the format. No real client, ticket or internal document appears on this page.

Can I download a sample report?

Yes. The Japanese and English sample PDFs are linked at the top of this page. We agree on the delivery format for your report during the consultation.

Can QC fix the bug it finds?

Your own developer can fix it. If you prefer, a small reproduced bug can be fixed separately from US$750 per item after you approve an estimate. The retest is then run from a non-implementing role.

Does "pass" mean we should release?

No. A pass means the checked conditions were met. QC gives a recommendation for the checked scope, and you make the release decision.

What if the retest finds the problem again?

It is reported with the same evidence. The one included retest covers the in-scope item; further rounds are agreed before they start.