Acceptance testing process, shared by you and QC
You and QC agree on what counts as a pass before testing starts. QC checks the agreed conditions, records the evidence, and reports the result so you can decide whether to release or accept the system.
QC recommends holding the release if there is a critical issue or a key condition cannot be verified. Your team makes the final decision and records how any remaining issues will be handled.
Six steps from request to decision
-
1. Request
You tell us what you want checked and by when.
- Purpose: what you need to be sure of before release
- Scope: which flows or screens are in, and which are out
- Target date: when you need the result
-
2. Agreement
Before starting, both sides write down the same conditions.
- Owner: who answers questions on your side and on QC's side
- Version: the exact build or release being checked
- Environment: where it is checked
- Reference: what "correct" is compared against (spec, screens, past behavior, your own expectation)
- Pass conditions: what must be true for each scenario to pass
- If expectations change, the version and the impact are recorded, with both sides agreeing
-
3. Verification
QC operates the system as a user would.
- Real operation, not only reading the screens
- Cross-checks where needed, such as whether a screen result matches the stored record
- Testing uses synthetic or anonymized data by default
-
4. Report
Every result is reported in the same shape.
- Status: Pass / Fail / On hold / Not run — each defined below
- Severity of each finding
- Steps to reproduce
- Expected result and actual result
- Evidence such as screenshots or recordings
- Serious findings are shared early, not held for the final report
- Pass
- Every agreed pass condition was met and observed.
- Fail
- Actual behavior differs from what was agreed; reported with steps and evidence.
- On hold
- Could not be judged yet, for example while an answer or a fix is awaited.
- Not run
- Not executed in this round, with the reason noted.
-
5. Retest
After a fix, the same conditions are run again.
- The fixed version is checked under the same conditions as before
- Confirmed by someone who did not do the fix
- Retests of the same scope that are included in the QC contract are not charged twice
-
6. Your final decision
You decide whether to release.
- Release, postpone, or release with known issues
- For anything left open, you record who owns it and why
- QC provides the facts; the responsibility for the decision stays with you
How tickets work
- One ticket covers one purpose and up to 5 scenarios.
- Before work starts, we agree the conditions and how many tickets will be used.
- The number of bugs found does not increase the charge.
- Prices are on the Testing and QA page.
Fictional example: shipping from stock
An example of how to agree on a measurable pass condition.
- Scenario
- Ship 3 units of an item with 10 in stock
- Expected
- Stock becomes 7 and one shipment record is created
- Extra check
- Press the ship button again, or reload and repeat the operation
- Expected
- Still one shipment record and stock stays 7
- Result
- Pass if both match. If a second record appears or stock drops again, it is reported as Fail with steps, expected vs actual, and a screenshot.
Pass conditions like these are written down in step 2, before testing begins.
Records shared with your team
The items below are shared between you and QC for every test.
- Owner, version, environment and reference
- Pass conditions and the scenario list
- Status definitions and severity
- Reports, steps to reproduce and evidence
- Records of changes to expectations
- The final decision and who owns open items
Project records are kept in a shared workspace with access agreed by both teams.
Questions
We have no written specification. Can we still test?
Yes. In step 2 we write down what "correct" means — existing screens, past behavior, or your expectations — and you confirm it. That agreed list is the reference.
Our specification keeps changing.
Changes are fine. We record the new version and what it affects, and both sides agree before we continue. Scenarios already run may need a retest.
The system was built by another company.
Yes. The tester evaluates the work independently of the developer who implemented it.
Who decides pass or release?
You agree on the conditions with QC. QC records whether each condition was met, and you decide whether to release or accept the system.